HOMEWORK

Year 9 Product Design Homework


Active Homework

Complete the shaping of the attachment point & drill the hole for the split ring 
OR 
The shaping of the attachment point, drill the hole for the split ring & finish the edges of the casting.

Date Due: 3-6-19


Previous Homework

Complete the casting of the small pewter product 
OR 
Complete the casting of the small pewter product, and shape the sprue into the shape required for the attachment point.

Date Due: 21-5-19

Complete the CAD drawing for the mould needed to make a small pewter cast product 
OR 
Complete the CAD drawing for the mould needed to make a small pewter cast product, including the decoration for the front and/or back.

Date Due: 14-5-19

Complete the design sheet for the pewter cast product 
OR 
Complete the design sheet for the pewter cast product, including detailed notes of explanation.

Date Due: 7-5-19

Complete the pewter casting moodboard 
OR 
Complete the pewter casting moodpboard and front & design brief slides.

Date Due: 29-4-19