HOMEWORK

Year 10 Design & Technology Homework

Active Homework

Prepare for a test on the metalwork finishing tools - emery cloth, wet & dry paper, metal polish, buffing machine & polishing compound (names).
OR
Prepare for a test on the metalwork finishing tools - emery cloth, wet & dry paper, metal polish, buffing machine & polishing compound (names & uses).Date Due: 13-12-19

Previous Homework

Prepare for a test on the metalwork finishing tools - emery cloth, wet & dry paper, metal polish, buffing machine & polishing compound (names).
OR
Prepare for a test on the metalwork finishing tools - emery cloth, wet & dry paper, metal polish, buffing machine & polishing compound (names & uses).
Date Due: 6-12-19

Prepare for a test on the metalwork drilling tools - centre punch, twist bit, pillar drill, chuck key, drill clamp (names).
OR
Prepare for a test on the metalwork drilling tools - centre punch, twist bit, pillar drill, chuck key, drill clamp (names & uses).
Date Due: 29-11-19

Prepare for a test on the metalwork cutting tools - hacksaw, coarse flat file & fine flat file (names).
OR
Prepare for a test on the metalwork cutting tools - hacksaw, coarse flat file & fine flat file (names & uses).
Date Due: 22-11-19

Prepare for a test on the metalwork marking out tools - scriber, engineer's square, odd leg calipers, dividers (names).
OR
Prepare for a test on the metalwork marking out tools - scriber, engineer's square, odd leg calipers, dividers (names & uses).
Date Due: 15-11-19

Complete the evaluation of the mechanical toy
OR
Complete the evaluation of the mechanical toy, using connectives to ensure you use detailed comments.
Date Due: 8-11-19

Complete the cutting of the dowels for the mechanical toy
OR
Complete the cutting of the dowels & assembly of the mechanical toy, inc. sanding the outside of the frame.
Date Due: 1-11-19

Complete the drilling & shaping of the cams, pulleys & dics of the mechanical toy
OR
Complete the drilling & assembly of the cams, pulleys & dics of the mechanical toy, inc. sanding.
Date Due: 9-10-19

Complete the drilling & assembly of the frame
OR
Complete the drilling & assembly of the frame, inc. sanding.

Date Due: 2-10-19

Complete the material list of your final design
OR
the material list of your final design, & copy & paste it into your MS PPP - inc. resizing.
Date Due: 25-9-19

Complete the working drawing of your final design
OR
the working drawing of your final design, & paste a Snip of the 2D Design screen into your MS PPP - inc. cropping & resizing.
Date Due: 18-9-19

Complete the model of your final design
OR
the model of your final design, & upload photos into your MS PPP - inc. cropping & resizing.
Date Due: 15-7-19

Complete the sketches of the parts for your final design 
 OR 
 the sketches of the parts for your final design, including colouring & annotation, & upload a photo - inc. cropping & resizing.
Date Due: 8-7-19

Complete the sketches for your 3 ideas 
 OR 
 the sketches for your 3 ideas, including rendering & annotation, & upload a photo - inc. cropping & resizing.

Date Due: 1-7-19